Manufacturing (MRP)
Define multi-level bills of materials, run production orders, track man-hours, and land finished goods in inventory. Lots are traced for recalls.
How it works
Define what goes into a product
Start the build
Make it and record man-hours
Finished goods land in stock
Real production starts with a real bill of materials, not a spreadsheet one engineer maintains. Manufacturing builds from a maintained BOM and keeps the build, the materials consumed, and the labor in one place.
A bill of materials locked in one engineer's file, with builds happening on the floor and nothing recorded, makes costs guesses and recalls impossible. Manufacturing ties the BOM, the order, the materials, and the labor together, so each unit's real cost and the lot a part came from are knowable.
What you can do
- Build multi-level BOMs. Define assemblies and sub-assemblies, with quantities and components that roll up correctly.
- Run production orders. Start a build against a BOM, and issue the components from inventory as they are used.
- Track man-hours. Record the time and labor on each order, so you can see what a build actually cost to make.
- Land finished goods in stock. Completed units go into inventory, optionally with a lot for traceability.
- Trace by lot. Finished goods and components can carry lot numbers, so a recall reaches the right units fast.
How it works
A production order is created from a BOM, components are issued from inventory, man-hours are recorded, and finished goods go back into stock. Because the BOM, the order, and the stock movements share one system, the materials consumed and labor hours are recorded on the order, so you can calculate build cost without a separate spreadsheet.
How it connects
Related features
Keep an accurate count of what's in your warehouses and record every movement as it happens. Handles multiple warehouses, reservations, stock counts, and lot tracking.
A double-entry ledger with invoices, bills, payments, journals, budgets, and month-end close. Entries post automatically from sales, purchases, and expenses.
Related guides
Frequently asked questions
Can I manage multi-level bills of materials?
Yes. Sub-assemblies roll up into parent products, so a change to a component updates everywhere it is used.
Are materials consumed automatically?
Materials are issued from inventory against the production order, so stock drops as components are used.
Can I track labor and man-hours per order?
Yes. Record hours against each order to see the time and labor that went into a build.
Is quality control included?
Not yet. There is no dedicated quality-inspection feature today, and production orders track the build, materials, and labor but not inspection results.
See it in your own operations
Start with the one feature that hurts most, then expand when it proves itself.
Get started